We provide services that are adapted each time to the specific need that will be presented, while our services are based on the know-how, that has been developed in terms of the implementation of technical energy projects in our country and abroad.


In the year 1999 to 2005 the President and CEO of our company, Mr. Goutos Charalambos, took over as technical director of the company Ch. Rokas SA. the study and the construction supervision of similar projects with a total capacity of ~ 190 MW. During the same period, he constructed for the company four substations 20/150 KV, 40/50 MVA each and two lines 150 KV with a total length of ~ 10 Km.
In the year 2005 and with his departure from the company Ch. Rokas SA, the company DOKOS SA was founded, with which Mr. C.Goutos undertook and constructed the following energy project:

  • Sidirokastro Wind Farm, 17 MW.

The years 2006-2007:

  • Wind Farm “ Mitoula” , Alexandroupolis, 38 MW. In this project, the contractor had undertaken installation of inside network of the wind turbine (Vestas V 90), three underground lines (3 lines x 3x1x630), 20 KV, interconnection of the Wind Farm with the substation, total length ~ 110 Km and 110 underground connections (straight joints) of the MV cables.

In 2007:

  • W/F “ KOYPIA” , Molaoi, 6,4 MW
  • W/F “ TOYRLA ” , Molaoi, 8,25 MW
  • W/F “ RACHI GIONI ” , Molaoi, 10,2 MW
  • External interconnection facilities of 20KV, more than 22 Km of total length.
  • W/F “ ALOGOMANDRIA ” , Voiotia, 20 MW
  • W/F “ MEGALOVOUNA ” , Voiotia, 8 MW
  • External interconnection facilities of 20KV, more than 18 Km of total length.

In 2008 and with his departure from the company DOKOS SA, the company C.GOUTOS SA was founded, with which we constructed the following energy projects:

  • W/F Megalovouni, Drama, 22 + 8 MW
    • Design, supply and construction –Turn Key project
    • Installation of: Wind farm inside network (33km underground network), FO network, grounding system, Control Room, all the necessary joints and MV cable termination.
    • Installation of two underground lines (2 lines x3x1x400mm2),20KV, for interconnection of the wind farm with the substation, total length 36Km
    • Supervision of substation construction 20/150kV, 50MVA.

In 2009 we constructed the following energy projects:

  • PV “Helioependitiki SA” 1050 KW, Arcadia. In this project, Mr. Goutos Charalambos is a shareholder and Vice President of the company. This project was electrified on February 10, 2010.

In 2010 we constructed the following energy projects:

  • WF “ARACHNAIO” 38MW , Argolida
    • Installation of: Wind farm inside power network, FO network, grounding system and all the necessary joints and MV cable termination.
    • Installation of one overhead MV line.
    • Three underground lines (3 lines x3x1x630mm2), 20kV, for interconnection of the wind farm with the substation, total length 162Km.
  • FV “ MOUROUTSOS GEORGIOS “ , 20 KW, Arcadia

In 2011 we constructed the following energy projects:

  • WF “ KREKEZA – MOGGOLIOS ” – WF “ RACHOULA – PASCHALIES ” TERNA ENERGY S.A
    • Electrical Installation of Powerful currents Control Room
    • Electrical Installation of Weak Currents Control Room
    • Installation of Water Supply Network
    • Switchgear Installation of B Distribution.
  • Installation PV panels on roof, 10 KW, Pavlia, Arcadia

In 2012 we constructed the following energy projects:

  • WF “LOGARAKIA”, Argolida, TERNA ENERGY S.A.
    • Installation of: Wind farm inside network, FO network, grounding system, including all necessary cable joints and MV cable termination.
    • Commissioning tests for Underground MV cables.
    • Installation of FO network and FO cable commissioning tests
    • Generators connection with MV switchgears inside the wind turbine.
    • Electromechanical works inside the Room Control.
    • Installation of power network of PV
  • Installation of PV station on the rooftop of Industrial Building, 998,07 KW, Argolida. First energization in 2013
  • Installation PV panels on roof , 10 KW, Arcadia

In 2013 we constructed the following energy projects:

  • WF “DERVENI” , Municipality of Alexandroupolis – Evros, TERNA ENERGY S.A.
    • Installation of underground MV network for interconnection of the wind farm with the substation.
    • Installation of Wind farm inside network.
  • WF “XYROVOUNI” , Municipality of Alexandroupolis – Evros, TERNA ENERGY S.A.,
    • Installation of underground MV network for interconnection of the wind farm with the substation.
    • Installation of Wind farm inside network & wind turbines’ lifting works.
  • WF “CHYLOS”, Municipality of Alexandroupolis – Evros, TERNA ENERGY S.A
    • Installation of underground MV network for interconnection of the wind farm with the substation.
    • Installation of Wind farm inside network & wind turbines’ lifting works.

In 2014 we constructed the following energy projects:

  • WF “GOURI MELES”, Attica City, TERNA ENERGY S.A
    • Installation of underground MV network for interconnection of the wind farm with the substation.
    • Installation inside network of Wind farm & wind turbines’ lifting works.
  • WF “CHYLOS”, TERNA ENERGY S.A

    • Installation of FO network.
  • WF “LOGGARAKIA”, Argolida, TERNA ENERGY S.A

    • Installation of control room
  • WF “MARISTI ”, Voiotia, TERNA ENERGY S.A
    • Installation of underground MV network ( 54km )
    • Installation of FO network ( 6km )

In 2015 we constructed the following energy projects:

  • WF “MAYROVOUNI”, Voiotia, TERNA ENERGY S.A
    • Installation of underground MV network for interconnection of the wind farm with the substation.
    • Installation of Wind farm inside network.
  • WF “MARISTI”, Voiotia, GLOBAL ENERGY SEVICES SIEMSA S.A
    • Installation of underground MV network for interconnection of the wind farm with the substation, total length 126Km.
    • Installation of FO network, 14km
  • WF “AGIOS GEORGIOS I & II”, 73,2 MW, East Attica, TERNA ENERGY S.A
    • Installation of underground MV network for interconnection of the wind farm with the substation.
    • Installation of Wind farm inside network.

In 2016 we constructed the following energy projects:

  • WF “MOUGOLIOS-PLAGIA-PSILOMA”, 30 MW, Municipality of Tsanagras – Voiotia, TERNA ENERGY S.A
    • Installation of: Wind farm inside power network, FO network, grounding system, including all necessary joints and MV cable termination.
    • Electrical works inside wind turbines
    • FO network test
    • Commissioning tests for Underground MV cables.
    • Electrical works inside control room.
  • WF “MAYROPLAGIA-KASTRO”, 16 MW, Dervenochoria – Voiotia, TERNA ENERGY S.A
    • Installation of: Wind farm inside power network, FO network, grounding system, including all necessary joints and MV cable termination.
    • Electrical works inside wind turbines
    • FO network test
    • Commissioning tests for Underground MV cables.
    • Electrical works inside control room.
  • WF “AGKISTRO”, Serres, VESTAS WIND TECHNOLOGY SA
    • MV cable terminations in the switchgears of the WTs.
  • WF “AG.GEORGIOS”, East Attica, VESTAS WIND TECHNOLOGY SA
    • MV cable terminations in the switchgears of the WTs.
  • WF “DRAGOUNI”, Arcadia, VESTAS WIND TECHNOLOGY SA
    • MV cable terminations in the switchgears of the WTs.
  • WF “KLOKOVA”, Aitoloakarnania, VESTAS WIND TECHNOLOGY SA
    • MV cable terminations in the switchgears of the WTs.
  • WF “SIDIROKASTRO”, Serres, VESTAS WIND TECHNOLOGY SA
    • MV cable terminations in the switchgears of the WTs.
  • WF “MAVROPLAGIA”, Dervenochoria – Voiotia, VESTAS WIND TECHNOLOGY SA
    • MV cable terminations in the switchgears of the WTs.
  • WF “LYRKEIO”, Municipality of Tripolis – Arcadia, VESTAS HELLAS SA
    • MV cable termination in the switchgears.
    • Installation of HV cable.

In 2017 we constructed the following energy projects:

    • WF “PARTHENIO”, Korinthos, Municipality of Tripolis, VESTAS HELLAS SA
      • MV cable terminations in the switchgears of the WTs.
    • WF “PARTHENIO”, Korinthos, Municipality of Tripolis, VESTAS HELLAS SA
      • MV cable terminations in the switchgears of the WTs.
    • WF “MOUSOURES & ROVAS”, Chania – Crete, VESTAS HELLAS SA
      • Wind Turbines MV Switchgears service
    • WF “ERESOS-LEYKES”, 37.8 MW, Kozani, TERNA ENERGY S.A
      • Installation of: Wind farm inside power network, FO network, grounding system, including all necessary cable joints and MV cable termination.
      • Two underground lines (2 lines x3x1x800mm2), 20kV, total length 8.5Km, and one underground line (3x1x400mm2), total length 8.5km, for interconnection of the wind farms with the substation (including all necessary cable joints, and cable termination in the switchgears).
      • FO network test.
      • Commissioning tests for Underground MV cables.
      • Electrical works inside control room.
    • WF “MEGALO VOUNO”, Evoia, VESTAS
      • MV cable terminations in the wind turbines’ switchgear
    • WF “KTENIAS”, EL.TEX.ANEMOS
      • MV cable terminations , constructions of cable connections
    • PV “SAMPALES” BIOSAR ENERGY SA
      • Localization and restoration of LV cable fault
    • WF “KAPSALA” & WF “GORITSA”, Voiotia, VESTAS HELLAS SA
      • Ground resistance measurements
    • WF “ LIRKIO ”, Tripoli, EL.TEX.ANEMOS S.A
      • MV cable terminations
    • WF “TSOUKAS ”, Tripoli, VESTAS HELLAS SA
      • Wind Turbines’ MV switchgear of service
    • PV “SOLFIELD”, Industrial aera of Larisa, BIOSAR ENERGY S.A
      • Ground resistance measurements
    • WF “KAPSALA KOUKOS”, Voiotia, VESTAS HELLAS SA
      • MV Switchgear pre-commissioning tests.
      • MV cable termination in the switchgear.
    • WF “KAPSALA KOUKOS”, Voiotia, VESTAS HELLAS SA
      • MV Switchgear pre-commissioning tests.
    • WF “SKOPIA” , Aitoloakrnania, TERNA ENERGY S.A.
      • Pre-location test for locating MV underground cable fault.
      • Pinpointing & localization MV underground cable fault.
      • Cable fault Repair (with new cable joints)
      • VLF test
    • WF “KALDERIMI”, VESTAS HELLAS SA
      • MV cable terminations in the switchgears of the WTs.
    • WF “RACHOULA III”, Dervenochoria – Voiotia, TERNA ENERGY S.A
      • Installation Of wind farm inside power network, FO network, grounding system, including all necessary cable joints and MV cable terminations.
      • FO network test
      • Commissioning tests for Underground MV cables(Partial Discharge, VLF and sheath integrity test)
    • WF “PEFKIAS”, Thiva- Voiotia, THIVAIKOS ANEMOS ENERGY S.A
      • Commissioning tests internal & external network, VLF, PD, TanD
    • WF “KALDERIMI”, VESTAS HELLAS SA (2017).
      • MV switchgears handlings & first energization.

    In 2018 we constructed the following energy projects:

      • WF “KERVEROS”, Rodopi, C.ROKAS SA
        • Pre location test for localization of MV underground cable fault
        • VLF Test
        • Restoration of MV underground cable
      • WF “RACHOULA”, Dervenochoria, TERNA ENERGY SA
        • Pre location test for locating MV underground cable fault
        • VLF Test
        • Restoration of MV underground cable
      • WF “KTENIAS”, Argos, EL.TEX.ANEMOS (2017).
        • Installation of all the necessary cable joints in MV switchgears
        • VLF & PD tests
      • WF “ RACHOULA III “ , Dervenochoria, Voiotia, VESTA WIND TECHNOLOGY S.A
        • MV Switchgear handlings first energization
      • WF “KTENIAS”, Argolida, EL.TEX.ANEMOS SA
        • Pre location test for locating MV underground cable fault
        • Restoration of MV underground cable
      • WF “LITHARI”, Voiotia, WIND TECHNOLOGY SA
        • HV switchgear cable terminations
        • Switchgear handlings first energization
      • WF “GAVROVO-CHIONAKI”, 38 MW, Amfilochia – Aitoloakarnania, AKTOR SA.
        • Installation of: Wind farm inside power network, FO network, grounding system, including all necessary cable joints and MV cable termination.
        • Installation of underground line 1x(3x1x1000mm2 Al & 3x1x630mm2 Αl) , 20kV, total length 19.5Km, for interconnection of the wind farms with the substation (including all necessary cable joints, and cable termination in the switchgears).
        • FO network test
        • Commissioning tests for Underground MV cables (Partial Discharge,TanD, VLF and sheath integrity test).
        • Electrical works inside control room.
      • WF “KOUROMANTRI-RIGANOLAKA”, VESTAS HELLAS SA (2018).
        • MV Switchgear pre-commissioning test.
        • HV cable termination in the switchgear.
      • WF « PETALAS» , VESTAS WIND TECHNOLOGY SA
        • HV cable termination in the switchgear.
        • Switchgear handlings first energization
        • Ground resistance measurements.
      • WF « ΒΟΖΙΚΙ» & WF « VOUVALA», Municipality of Tripolis, VESTAS WIND TECHNOLOGY SA
        • HV cable termination in the switchgear.
        • MV switchgear pre commissioning tests
        • Switchgear handlings first energization
      • WF « SPARTA KAKOREMA », Municipality of Thiva – Voiotia, VESTAS WIND TECHNOLOGY SA
        • HV cable termination in the switchgear
        • MV switchgear pre commissioning tests
        • Switchgear handlings first energization
      • WF « HELIOLOUSTI », Evoia, ENEL GREEN SA
        • MV underground power network mapping measurements
        • Installation of FO network of WF “ HELIOLOUSTI II “.
      • WF « SERVOUNIA Kalogeriki Rachi & Vorina Li8aria», Evoia, TERNA ENERGY S.A
        • Installation of 2 MV underground lines ( 200 KV , 3x1x240mm2 & 3x1x300mm2 ) with interconnection with the substation , total length 30km.
        • MV cable termination with the switchgears of WTs
        • Electromechanical works inside the WTs
        • Commissioning Test for underground MV cables ( Partial Dischargw, VLF)
        • FO commissioning test
      • WF « MAVROPAIDI», Xanthi – Macedonia, TERNA ENERGY S.A
        • HV cable termination in switchgears of WTs
        • Commissioning in MV switchgears of WTs
        • MV switchgear handlings of WTs and first energization.
      • WF « FLAMPOURO», VESTAS WIND TECHNOLOGY SA
        • HV cable termination in the switchgear
        • MV switchgear pre commissioning tests
        • Switchgear handlings first energization
      • WF “ANTIA A & B ”, C ROKAS SA
        • Wind Turbines MV Switchgears service .

      In 2019 we constructed the following energy projects:

        • WF « TETRAPOLIS », VESTAS WIND TECHNOLOGY SA
          • Installation of MV underground straight joints
        • W/F “LIRKIO” , Municipality of Tripolis , Prefecture of Arcadia, EL.TEX.ANEMOS S.A
        • WF « LOUPOUNARIA », VESTAS WIND TECHNOLOGY SA
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
          • MV cable terminations in the switchgear of the WTs
        • WF « RACHOULA », TERNA SA
          • Pre location test for locating MV underground cable fault
          • VLF Test
          • Installation of MV underground straight joints
        • WF « AGIA DYNATI », EL.TEX.ANEMOS SA
          • Pre location test for locating MV underground cable fault
          • VLF Test
          • Installation of MV underground straight joints
        • W/F “ KASIDIARIS” , Municipality of Zitsa & Pogoniou, Regional unit of Ioannina, Region of Epirus EL.TEX.ANEMOS S.A
          • Localization & restoration of sheath MV underground cable fault.
        • WF « GAVROVO», 24 MW & WF “ CHIONAKI “ 14 MW, Aitoloakarnania, AKTOR ATE.
          • WF’s First energization
        • WF « ΒΟΖΙΚΙ» & WF « VOUVALA», VESTAS WIND TECHNOLOGY SA
          • MV Switchgear handlings wind turbines first energization
        • WF « ADERES», Municipality of Trizinia – Methana, BUSINESS ENERGY WIND ENERGY TROIZINIAS S.A
          • Localization & restoration of sheath MV underground cable fault
        • WF « MAGOULA KAZAKOU», Municipality of Alexandroupolis – Evros, EL.TEX.ANEMOS S.A
          • Localization & restoration of MV underground cable fault and construction of all the necessary straight cable joints.
        • WF « LAIMOS», VESTAS WIND TECHNOLOGY SA
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
          • MV cable terminations in the switchgear of the WTs
        • WF « KOROMPILI», 21,5 MW, VESTAS WIND TECHNOLOGY SA
          • Installation of 2 underground lines for interconnection of the WF with the substation , (MV ,20kV,2X ( 3x1x630mm2) total length 19km, FO network, grounding system including all the necessary cable joints, MV cable termination.
          • Commissioning Test for underground MV cables ( Partial Dischargw, VLF)
          • FO commissioning test
          • HV cable termination in the switchgears of WTs.
        • WF « EAST ASKIO – MAESTROS & WEST ASKIO », 90 MW, Kozani, TETRAKTIS SA
          • Installation of Wind Farm insidenetwork with the substation 33kV – 4x ( 3x1x800mm2 Al) with the substation, FO network, grounding system, including all the necessary MV cable joints & MV cable termination
          • E/M works ( Supply & Installation ) of Control Room of Substation “ Gratsianis “.
          • Installation of weak & high currents network, lightning system, air conditioning system, lightning protection etc.
          • FO commissioning test
          • Commissioning tests for MV underground cables, ( sheath cable terminations VLF, Loss dissipation factor/Tand)
        • WF « KASIDIARIS I & KASIDIARIS II», 90 MW, TETRAKTIS SA
          • Installation of Wind Farm inside network with the substation 150/33kV,
          • FO network, grounding system, including all the necessary MV cable joints & MV cable termination
          • FO commissioning test
          • Commissioning tests for MV underground cables, ( VLF, Loss dissipation factor/Tand)
        • W/F “ SKOPIES A & B” , WF “ MAKRIRACHI A & B ”, Municipality of Karystos, Regional unit of Evoia, X. ROKAS S.A
        • WF « ORPHEFS EPTADENDROS», 28,8 MW, TETRAKTIS SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « AGRIA ACHLADIA, PYRGARI II, VOUREZA, MESOKIPI & KOSKINA LAKKA», 60 MW, TERNA ENERGY SA.
          • Installation of Wind Farm inside network with the substation 150/33kV,
          • FO network, grounding system, including all the necessary MV cable joints & MV cable termination
          • Installation of FO network & FO commissioning tests
          • Commissioning tests for MV underground cables, ( VLF, Partial
          • Discharge, Loss dissipation factor/Tand)
        • WF « EAST ASKIO – MAESTROS» & « WEST ASKIO » 72 MW, Kozani, VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « POLYREMA» & « KORYFI» 28,8 MW, VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « PROFITIS ILIAS », VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « SARAKATSANEIKA », VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « MEGALO VOUNO », AIOLIKI ENERGEIAKI EYVOIAS SA
          • Electromechanical equipment maintenance works of MV cable terminations of the substation “MYRTIA”, the control room and the wind turbines.
        • WF « ORPHEFS EPTADENDROS», 28,8 MW, TETRAKTIS SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization

        In 2020 we constructed the following energy projects:

        • WF « MANDRA », VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « KASIDIARIS I» & « KASIDIARIS II » 90 MW, VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « TRIA ALONIA », VESTAS WIND TECHNOLOGY SA
          • Installation of SCADA system
        • WF « DALAMAKI», 10,8 MW , INTERPHOTON SA
          • Installation of Wind Farm inside network with the substation «ΚΥTHAIRONA» , (MV ,20kV, 1x ( 3x1x400mm2 Al) total length 13×3 km, FO network, grounding system including all the necessary cable joints, MV cable terminations.
          • Installation of FO network termination & FO commissioning tests
          • Commissioning tests for MV underground cables, ( VLF, Partial Discharge, Loss dissipation factor/Tand)
        • WF « ACHLADITSA», 18 MW , INTERPHOTON SA
          • Installation of Wind Farm inside network with the substation «ΚΥTHAIRONA» , (MV , 30kV, 1x ( 3x1x400mm2 Al) total length 17×3 km, FO network, grounding system including all the necessary cable joints, MV cable terminations.
          • Installation of FO network termination & grounding system, FO commissioning tests
          • Commissioning tests for MV underground cables, ( VLF, Partial Discharge, Loss dissipation factor/Tand)
        • WF « MARTINO », VESTAS WIND TECHNOLOGY SA
          • MV switchgear maintenance inside wind turbines
        • WF « PYRGARI », VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « DALAMAKI», 10,8 MW , Thiva – Voiotia, VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « ACHLADITSA», 18 MW , Thiva – Voiotia , VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « MEGALO VOUNO », Karistos – Evoia, WIND ENERGY EYVOIAS SA
          • Electromechanical equipment maintenance works of MV cable terminations of the substation, the control room and the wind turbines.
        • WF « KOS », 4.2 MW, Dodekanisa – Aegean Sea, X.ROKAS SA
          • MV Switchgear Maintenance works, substation & WTs
        • WF « LEROS », 4.2 MW , Dodekanisa – Aegean Sea , X.ROKAS SA
          • MV Switchgear Maintenance works, substation & WTs
        • WF « KEDROS », 13.8 MW , Arachova – Central Greece, ENERCON SA
          • Switchgear Maintenance works of substation
        • WF “AGRIOKERASIA”, “ ASPROVOUNI” * “ANO LITHARIA “ 48 MW , Municipality of Tripolis – Arcadia, ENERCON SA
          • MV Switchgear Maintenance works of substation
        • WF « KASTRO – LYKOVOUNI & AMPELIA », 54 MW , Municipality of Thiva – Central Greece, VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization

        In 2021 we constructed the following energy projects:

        • WF « TARATSA », 35 MW , Municipality of Thiva – Voiotia, TERNA ENERGY S.A
          • Installation of Wind Farm inside network with the substation , (MV , 30kV, 1x ( 1x3x800mm2 Al) total length 10km, FO network, grounding system including all the necessary cable joints, MV cable terminations of the WF.
          • Electrical works inside the wind turbines.
          • FO commissioning tests
          • Commissioning tests for MV underground cables, ( VLF, Partial Discharge)
        • WF « DYO PETRES, MAVRA LITHARIA & DIDIMA », 24 MW , Municipality of Sidikis, VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « MEGALI RACHI », 3 MW , Municipality of Thiva – Voiotia,VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings of WTs & first energization
        • WF « RACHOULA », Municipality of Dervenochoria – Voiotia,TERNA ENERGY S.A
          • Localization test for MV underground cable fault
          • Restore MV underground cable, construction of underground straight joints
          • VLF test before energization
        • WF « STAVROS», 25,2 MW , Municipality of Karistos – Evoia, VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « STOA», 3 MW , Municipality of Thiva – Voiotia, VESTAS WIND TECHNOLOGY SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF « VROMOSYKIA », Municipality of Troizinia, ELLAKTOR SA
          • Location test for MV underground cable fault
          • Restore MV underground cable, construction of underground straight joints
          • VLF test before energization
        • WF « PATRIARXIS », Rodopi – Macedonia, X.ROKAS
          • Location test for MV underground cable fault
          • Restore MV underground cable, construction of underground straight joints
          • VLF test before energization.
        • WF « PALLARACHI » 10MW, « ELLINIKO », 6MW, « KLOKOVA II » 3 MW, Municipality of Naypaktos – Aitoloakarnania, AWBS ENERGIAKI SA
          • Installation of Wind Farm inside network with the substation «Vlachomandra» , (MV ,30kV, 1x ( 3x1x240mm2 Al) total length 32×3 km, FO network, grounding system including all the necessary cable joints, MV cable terminations.
          • Installation of FO network termination & FO commissioning tests
          • Commissioning tests for MV underground cables, ( VLF, Partial Discharge, Loss dissipation factor/Tand)
        • WF « MAGOULA KAZAKOU » Municipality of Alexandroupolis – Evros, ELLAKTOR S.A
          • Pinpointing & localization MV underground cable fault
          • Restoration & construction of all the necessary MV cable straight joints
        • WF « PALLARACHI » 10MW, « ELLINIKO », 6MW, « KLOKOVA II » 3 MW, Municipality of Naypaktos – Aitoloakarnania , AWBS ENERGIAKI SA
          • MV cable terminations in the switchgear of the WTs
          • Installation of SCADA system
          • MV switchgear pre commissioning tests
          • Switchgear handlings first energization
        • WF “MONI TOPLOU” 3MW, Municipality of Sitia – Crete, VESTAS HELLAS SA
          • Installation of Scada system